Tanjong Aru resort Hotel
300-bed resort hotel built on reclaimed land. Reinforced concrte shear wall structure founded on precast concrete piles.
Developed by Sabah Land Development.
Completed in 1983 (while Ir Dr Wong was Technical director of HKHC).